Commissioning – Trelleborg, Sweden
As part of the large-scale development and modernisation of the power distribution infrastructure in Trelleborg, Sweden, a new 130 kV ring network was developed, comprising four new 130/10 kV substations. The project enhances the reliability, flexibility and redundancy of the power supply across the region.
The PSS Bulgaria team participated in the testing and commissioning of the electrical equipment.
PSS Bulgaria’s scope of work included:
- testing of current transformers (CTs) and voltage transformers (VTs);
- verification of wiring in control and protection relay panels;
- functional testing and commissioning of 10 kV switchgear;
- functional testing and commissioning of 145 kV air-insulated switchgear (AIS).
Testing and commissioning are critical stages prior to energisation and the entry into service of any high-voltage installation. These activities verify the correct operation of individual components, protection systems, control and measurement circuits, as well as the proper interaction between the different systems.
PSS Bulgaria’s involvement in the Trelleborg project forms part of the company’s international experience in testing, commissioning and putting power system equipment into operation.