—   SELECTED PROJECTS   ● ● ●   2009–2026The Engineering Behind Reliable Energy Infrastructure.

Projects showcasing PSS Bulgaria’s expertise in the construction, grid connection, and maintenance of complex energy infrastructure.

233+
Completed Projects

360°

Full Engineering Lifecycle

18+

Years of Engineering Experience

6–400

kV Voltage Levels

PORTFOLIO

Selected
Landmark Projects

Five selected projects. Part of 233+ proven examples of PSS Bulgaria’s engineering capabilities.

FEC-Terasol-Stara-Zagora-PSS-Bulgaria

Terasol

01 / FLAGSHIP PROJECT
PV POWER PLANT · SUBSTATION · BESS · EPC + O&M
Stara Zagora
Client: Sea Solar Energy Ltd.

The Terasol Project integrates complex energy infrastructure for the grid connection, management, and storage of energy from a 100 MW photovoltaic power plant.

100MW PV POWER PLANT
185MWh BESS
110kV GRID CONNECTION

PSS Scope of Work

As the EPC contractor, PSS delivered a 33/110 kV step-up substation with two power transformers, a 110 kV interconnecting cable line, and the required reconstruction and grid connection works at the 110 kV ATZ substation.

As part of the project’s further development, PSS also delivered two Battery Energy Storage Systems (BESS):

  • 50 MW / 61 MWh BESS, commissioned in 2025;
  • 33 MW / 124 MWh BESS, commissioned in 2026.
One of the key engineering challenges was the specific site conditions, with the project located on an ash disposal site with approximately 9 metres of fill. To ensure the required structural stability, pile foundations were used for selected facilities and equipment.
Key Parameters:

100 MW PV Power Plant · 33/110 kV Substation

2 Power Transformers · 110 kV Cable Line

63 MW Total BESS Power · 185 MWh Total Storage Capacity

Ramanusha

02PV POWER PLANT · SUBSTATION · BESS
Sliven
Client: “Ramanusha Park” Ltd.

The Ramanusha Project integrates power infrastructure for the grid connection, management, and storage of energy from a 48 MW photovoltaic power plant.

48 MWpup to 122 MWh

As the EPC contractor, PSS delivered a 33/110 kV step-up substation with one power transformer and a 110 kV interconnecting overhead transmission line.

The facilities were commissioned in 2024.

As part of the project’s subsequent development, PSS also delivered two Battery Energy Storage Systems (BESS):

  • 16 MW / 32 MWh BESS, commissioned in 2025;
  • 24 MW / 90 MWh BESS, commissioned in 2026.
Key Parameters:

48 MW PV Power Plant · 33/110 kV Substation

1 Power Transformer · 110 kV Overhead Transmission Line

40 MW Total BESS Power · 122 MWh Total Storage Capacity

Karlovo 2

03RECONSTRUCTION · 110 kV OUTDOOR SWITCHYARD
Karlovo
Client: Chint New Energy Ltd.

The project involved the reconstruction of the 110 kV outdoor switchyard at the Karlovo 2 substation, owned by ESO, as part of the grid connection requirements for the Vedrare Project.

110 kV

As the EPC contractor, PSS carried out the supply of primary and auxiliary equipment, civil and electrical installation works, testing and commissioning, and final energisation of the facilities.

The reconstruction included the conversion of the existing H-configuration of the 110 kV outdoor switchyard into a single sectionalised busbar system. The new configuration comprises three outgoing feeder bays, two spare outgoing feeder bays, two transformer bays, one bus-section bay, and two metering bays.
A key engineering challenge was the unfavourable soil conditions for the installation of the earthing system. The solution involved the construction of a remote earthing grid, ensuring the required conditions for the safe and reliable operation of the substation.
Key Parameters:

110 kV Outdoor Switchyard Reconstruction · Single Sectionalised Busbar System

3 Outgoing Feeder Bays · 2 Spare Outgoing Feeder Bays · 2 Transformer Bays

1 Bus-Section Bay · 2 Metering Bays
Fotovoltaichna-centrala-Vedrare-izgradena-ot-PSS-Bulgaria

Vedrare

04SUBSTATION · GRID CONNECTION
Vedrare village
Client: Chint New Energy Ltd.

The Vedrare Project involved the development of the power infrastructure required to connect a 70 MWp photovoltaic power plant to the transmission grid.

70 MWp33/110 kV

As the EPC contractor, PSS delivered a new 33/110 kV step-up substation with one 70 MVA power transformer, together with a 110 kV interconnecting cable line to the Karlovo 2 substation.

The scope included consultancy, engineering and design, supply of primary and auxiliary equipment, civil and electrical installation works, testing and commissioning, and final energisation of the facilities.
Following project completion, PSS continues to provide O&M services, monitoring, and technical maintenance.
Key Parameters:

70 MWp PV Power Plant · 33/110 kV Substation

1 Power Transformer · 70 MVA

110 kV Cable Line

Boichinovci

05SUBSTATION · GRID CONNECTION
Boichinovci
Client: AEM Connect Ltd.

The project involved the development of the power infrastructure required to connect a 60 MWp photovoltaic power plant to the grid.

60 MWp33/110 kV

As the EPC contractor, PSS Bulgaria delivered a new 33/110 kV step-up substation with one 60 MVA power transformer, a 110 kV cable line, as well as a new 110 kV outgoing feeder bay at the Boychinovtsi substation, owned by ESO.

The scope included consultancy, engineering and design, supply of primary and auxiliary equipment, civil and electrical installation works, testing and commissioning, and final energisation.

Following project completion, PSS continues to provide O&M services and technical maintenance for the facilities.
Key Parameters:

60 MWp · 33/110 kV · 60 MVA

110 kV Cable Line

New 110 kV Outgoing Feeder Bay

FULL PORTFOLIO

Over 18 Years of Engineering Experience.
All in One Document.

Reference Projects

PSS Bulgaria Corporate Presentation

A trusted engineering partner throughout the entire project lifecycle.

OUR APPROACH

From Concept to a Fully Operational System.

01FEASIBILITY STUDY
Engineering Studies and Techno-Economic Assessment

02ENGINEERING & DESIGN
Technical Solutions and Detailed Engineering Documentation

03PROCUREMENT
Equipment Supply and Project Execution Management

04CONSTRUCTION
Construction, Installation, Testing and Commissioning

05OPERATION
Commissioning, Monitoring and Technical Maintenance

A trusted engineering partner throughout the entire project lifecycle.

233+
Completed Projects

BEFORE WE START

Frequently Asked Questions.

At what stage of a project is it best to involve PSS Bulgaria?

We can deliver the greatest value when involved from the feasibility study and conceptual design stages. Our team can also join a project already in progress, following a technical review of the available project documentation.

Yes. Depending on the project, the scope may include feasibility studies, engineering and design, equipment supply, construction and installation, testing, commissioning, and subsequent maintenance.

Yes. The specific scope is defined following a review of the project, its technical requirements, the responsibilities of the other parties involved, and the expected project timeline.

A brief project description, location, type and capacity of the facility, current stage of development, available project documentation, and the expected scope of work. Having a grid connection statement or a preliminary grid connection agreement in place helps streamline the overall process.

Yes. PSS Bulgaria provides operational and technical support, preventive maintenance, monitoring, and fault response for commissioned facilities.

What investors and partners need to know before starting a project.

Do you have another question? →

OUR NEXT PROJECT

Let’s Build
the Future of Energy
Together.

Share the key parameters and current stage of your project. Our engineering team will get in touch with you.